Crashing projects:
Sometimes we need to speed up the project to finish earlier than dead-end line pf the project. And we call this operation "crashing". Crashing a project directly relates to resource commitment. The more resources we willing to spend the faster we could finish the project.
There is some good reasons to crash a product:
1- Sometimes the schedule is too crowded so we did schedule the project with a series of activity durations so that make the crashing process must done
2- Change in market demand. For example, we find that another company developing the same project so we need to finish first to be the first on the market.
3- the project is way too much behind the schedule so we need to crash all the remaining activities.
4- The company may realize that it will be responsible for paying more in late delivery penalties than the cost of crashing the activities.

Options for Accelerating Projects

Crashing is one of several ways on which we manage our time in a project crashing or compressing the project is something that we do to reduce the amount of time that our project takes involves evaluating the critical path activities and seeing if they can be reasonably reduced in time and more than that seen if they can be cost-effectively reduced. For example, cost of an activity versus the time that it takes we have a point over normal cost and duration this tasks going to take 10 days and cost 500 dollars what we're going to do is we're going to ask those people that are involved in estimating o our project tell us using normal techniques and normal conditions if we added more resources to this task, how much could we shorten it by? And how much would it cost? If they respond to us and say that we could short this task just 5 days but we're going to double the price, so it's going to cost us 1000 dollars so if we draw this in a graph and…...

Similar Documents

Free Essay

The Responsibility Project

...The Responsibility Project The Responsibility Project 9/17/2012 ETH/316 The Responsibility Project The issues in this film are important because it shows how a typical shift may seem like everything goes wrong, and nothing could possibly make things worse. There are days when the typical worker wishes they did not get out of bed. Occurrences happen and people want to run off the job and give up, but people should not give up. Accidents happen, and when they do, people should evaluate what is happening at work. There are ways and options to fix broken lights, and equipment utilized on the job. At times it looks like there is no solution, but there are always options one may not view as available to them. The best option for an employee to choose is to not panic. The job looks dark at times, but there is a light at the end of the tunnel, or in this case, a light in the top of the lighthouse. The film teaches how equipment failures occur, but if people ban together and help each other the job will go smoothly and the organization of the company improves. The roles of external social pressures have a high amount of influence in organizational ethics. The news media, social networks, and word of mouth of customers affect the organizations publicity and reputation immensely. The employees of a company should always remember to help each other when they are able, and an extra hand makes light work. Social pressures influence organizations and companies to......

Words: 716 - Pages: 3

Premium Essay

Mangaement of Project

...N14C31 Managing Projects 01.10.2012 Lecture 1: Introduction to Project Management & WBS Dr Christos Braziotis Christos.Braziotis@nottingham.ac.uk Module Convenor Dr Christos Braziotis Lecturer in Supply Chain and Operations Management Nottingham University Business School, Room B37, South Building Tel: 115 9514026 Email: Christos.Braziotis@nottingham.ac.uk N14C31 – Managing Projects © Christos Braziotis, 2012-2013 – Nottingham University Business School Slide 2 Agenda • Introduction to the Module: – Aims – Resources – Assessment • Introduction to Project Management: – Aspects to consider in Project Management – Work Breakdown Structure N14C31 – Managing Projects © Christos Braziotis, 2012-2013 – Nottingham University Business School Slide 3 Introduction to Project Management N14C31 – Managing Projects © Christos Braziotis, 2012-2013 – Nottingham University Business School Slide 4 • The word “Project” is frequently used N14C31 – Managing Projects © Christos Braziotis, 2012-2013 – Nottingham University Business School Slide 5 • The word “Project” is frequently used N14C31 – Managing Projects © Christos Braziotis, 2012-2013 – Nottingham University Business School Slide 6 What is a Project? – Definitions • A temporary endeavor undertaken to create a unique product or service (US Project Management Institute) • Unique process, consisting of a set of coordinated and controlled activities with start......

Words: 3914 - Pages: 16

Premium Essay

Project Management

...the activity slacks. What is the total project length? Make sure you fully label all nodes in the network. The total project length is 22 weeks. c) Identify the critical path. What are the alternative paths and how much slack time is associated with each “feeder path?” Critical path: B – C – E – G Duration Path Slack Other paths : A – D – G 21 weeks 2 days A – E – G 16 weeks 1 day B – F – G 20 weeks 2 days d) Identify the “burst” activities and the “merge” activities. Burst Activities: A and B Merge Activities: E and G Chapter 9 – Question 7 Critical Path: A – C – D – F – H 22 Other Paths : A – B – E – H 18 A – B – D – F – H 20 A – C – G – H 17 Chapter 10- Question 4 a. Identify the sequencing of the activities to be crashed in the first four steps. Which of the critical activities should be crashed first? Why? The correct sequence for crashing activities is listed as: a) Activity E or G (cost for both $2,500 more) b) Activity E or G (cost for both $2,500 more) c) Activity B d) Activity D Ordered from the lower extra crashing cost to the higher. b. What is the project’s critical path? After four iterations involving crashing project activities, what has the critical path shrunk to? Critical Path is B-D-E-G = 21 weeks. After four iterations of crashing project activities, the critical path has reduced to 16 weeks. c. Suppose project overhead costs accrued at a fixed rate......

Words: 498 - Pages: 2

Premium Essay

Project Management

...In evaluating the schedule for the project of house flipping for a profit it is determined that the resources necessary for competition are to outsource utilizing local contractors who have been chosen through a competitive bid process. Quotes were sent to area contractors who specialized in the task needed to complete the various aspects of the project. Once the quotes were submitted, the contractors were selected based upon the lowest responsible bid. This process gives all area contractors the opportunity to bid on work and also benefits the home owner by ensuring that they are receiving the best possible price. After the winning contractors were selected, they were then notified as to the outcome and presented with a contractual agreement outlining the specific job and the expectations. After the contractors have been awarded the jobs, the schedule is then set up. The tasks are entered into Microsoft Project and then broke out into the subtasks such as siding, painting, and removing shingles. The tasks are assigned resources which include the specific contractors that will be performing the work. When evaluating the schedule, it is determined that because each contractor is responsible for various areas of the project, there will be an issues with allocation. What this means is that while the contractors who were hired to complete the exterior work can tackle the jobs such as siding and roofing, the contractors who were hired to complete the interior...

Words: 1131 - Pages: 5

Premium Essay

Project Management

...1).What is some of the issues that weigh in favor of and against crashing the project? In favor, this will help Joe get the project back on schedule. It will save his reputation as a project leader. This will also keep his company from having to pay penalties for going over the time limit. Against crashing, this may cost more than what the company will have to pay in penalties. The crash might get some of the work caught up but still not make the project come in on time. The crash could lower employee morale. He needs to know how much time it will save and how much the crash will cost. 2).Suppose you were the site supervisor for this project. How would you advise Joe to proceed? Before deciding whether to crash the project, what questions should you consider and how should you evaluate Your options? If I were the site supervisor I would tell Joe to first figure out how many activities needed to be caught up. Then I would tell him to figure out the cost of crashing each activity. Finally I would ask him how much time can be saved by crashing these activities? Now after all these things are done you can see just how much time can be saved and whether or not it will get him back on schedule. If it will get the project back on schedule then I would say go for it as long as the cost does not exceed the cost of the late penalties. Last but not least I would direct him to talk the key members of his team to see what input they might have. Inaddittion to that...

Words: 316 - Pages: 2

Premium Essay

Project Management Ch10

...Project Management, 2e (Pinto) Chapter 10 Project Scheduling: Lagging, Crashing, and Activity Networks 10.1 True/False 1) Finish to start lags are the same as additional activity slack. Answer: FALSE Diff: 2 Section: 10.1 Lags in Precedence Relationships Skill: Factual AACSB Tag: Reflective 2) The least common type of lag relationship occurs when a successor's finish is dependent upon a predecessor's start. Answer: TRUE Diff: 2 Section: 10.1 Lags in Precedence Relationships Skill: Factual AACSB Tag: Reflective 3) Gantt charts cannot depict float. Answer: FALSE Diff: 1 Section: 10.2 Gantt Charts Skill: Factual AACSB Tag: Reflective 4) In order to accelerate completion of a project, the manager must crash critical path activities. Answer: TRUE Diff: 1 Section: 10.3 Crashing Projects Skill: Factual AACSB Tag: Reflective 5) The critical path may not contain a dummy activity. Answer: FALSE Diff: 1 Section: 10.3 Crashing Projects Skill: Factual AACSB Tag: Reflective 6) Quite often the marginal gains in employee productivity decrease dramatically with the increased use of overtime. Answer: TRUE Diff: 2 Section: 10.3 Crashing Projects Skill: Factual AACSB Tag: Reflective 7) Most project management software employs AOA diagramming Answer: FALSE Diff: 2 Section: 10.4 Activity-on-Arrow Networks Skill: Factual AACSB Tag: Reflective 8) AOA is a more useful technique than AON if the project is complex and has many significant milestones. Answer: TRUE Diff: 2 Section: 10.4......

Words: 8067 - Pages: 33

Premium Essay

Project Management

...AD351– Project Management What is a project “Operations Management” is concerned with the transformation of inputs and resources into outputs. The transformation system to be used is dictated by the charateristics of the required inputs and the desired outputs. For instance, for mass manufacturing (where outputs and inputs are standardized, and products facing high demands are produced in very large quantities), the transformation system may take the form of an “assembly line” (as in automotive manufacturing). When managing a transformation system, the type of managerial concerns or problems to be addressed depends on the nature of the transformation system being used. For instance, managing an assembly line, we face concerns (which we will study later in this course) particular to assembly lines. A project is another way of transforming inputs and resources into outputs. Projects are the appropriate transformation processes to use when: - unique, custom outputs (products or services) may be demanded, - thus, a variety of non-standardized inputs may be used, - thus, two consecutive jobs or orders may require totally different durations, - typically, the desired production level is quite low, or even a single unit, - the transformation process may be stopped or delayed at little cost, and - a large part of the workforce needs to be highly skilled. Projects typically involve large scale, complex production processes. ...

Words: 10844 - Pages: 44

Premium Essay

Project

...Transcript of Project Management-A&D Conclusion Resource Analysis Thank You for Your Attention Recommendations Cost Analysis CIO Matt Webb had to decide on whether to buy an off the shelf software, or customize and build one. After conducting a cost benefit analysis, and much deliberation, Webb decided that building one would be more efficient. To start off, a cross functional team of 6 people was created to plan the project based on the “build” decision. After defining the teams planning components and requirements, the following resources and tools were required to complete the project. A&D’s Methodology The stores sales reach a peak during the holiday season and the CEO wanted to know if the project could be done in time to jump on the holiday sales. Objective A&D High tech was losing sales potential by not selling online. They wanted to finish implementing the online project before the holiday season and the project, manager Eric that there wasn’t enough time to getting up to speed on the project since they were already late. The loss of potential sales via the internet has led to decreasing margins and a tougher competitive environment due to A&D’s loss of a competitive advantage via Web Services. Missed opportunity of increasing revenues by decreasing costs per internet order. Addressed Issue A&D Tech specialize in selling computer related products and services. They had broken ground with their innovative made to order products and have been growing......

Words: 842 - Pages: 4

Premium Essay

Project Management

...complete later than scheduled, your project may not complete on time. Early Start (ES) - is the EARLIEST time the activity could possibly start. Early Finish (EF) - is the EARLIEST time the activity could possibly finish. Late Start (LS) - is the LATEST time the activity can start and not jeopardize the scheduled completion of the project. Late Finish (LF) - is the LATEST time the activity can finish and not jeopardize the scheduled completion of the project. Slack/Float - is calculated by: LF - EF, or LS - ES (both formulas will result in the same answer; if not, one of your numbers is incorrect). The slack/float tells you the number of days/weeks/months that an activity can begin late, or the number of extra days/weeks/months that an activity can take without impacting the completion time of the project. However, this time is shared by all of the activities on a path. If you use up all of your slack on an activity at the beginning of a path, subsequent activities will have less slack or no slack. 7. What is the definition of the project control process? Click to hide answer The project control process involves regularly gathering data on project performance, comparing actual performance to planned performance, and taking corrective actions if actual performance is behind planned performance. | 11. Define crashing a schedule. How does it relate to a time-cost trade-off? Click to hide answer Crashing a schedule means expediting the......

Words: 770 - Pages: 4

Premium Essay

Crashing Activity

...Rassy and the team were concerned with the results of your analysis. They spent the afternoon brainstorming alternative ways for shortening the project duration. They rejected outsourcing activities because most of the work was developmental in nature and could only be done in-house. They considered altering the scope of the project by eliminating some of the proposed product features. After much debate, they felt they could not compromise any of the core features and be successful in the marketplace. They then turned their attention to accelerating the completion of activities through overtime and adding additional technical manpower. Rassy had built into her proposal a discretionary fund of $200,000. She was willing to invest up to half of this fund to accelerate the project, but wanted to hold onto at least $100,000 to deal with unexpected problems. After a lengthy discussion, her team concluded that the following activities could be reduced at the specified cost: • Development of voice recognition system could be reduced from 15 days to 10 days at a cost of $15,000. • Creation of database could be reduced from 40 days to 35 days at a cost of $35,000. • Document design could be reduced from 35 days to 30 days at a cost of $25,000. • External specifications could be reduced from 18 days to 12 days at a cost of $20,000. • Procure prototype components could be reduced from 20 days to 15 days at a cost of $30,000. • Order stock parts could be reduced from 15 days to 10...

Words: 963 - Pages: 4

Premium Essay

Project Management

............................................................................. 4 Main Body .............................................................................................................................................. 5 1.0 Project Charter ......................................................................................................................... 5 Project Vision .................................................................................................................................. 6 Project Objectives/Deliverables ....................................................................................................... 6 Assumptions .................................................................................................................................... 7 Risks and Dependencies................................................................................................................... 7 Actor Catalog .................................................................................................................................. 9 Business Process Flow ................................................................................................................... 10 Project Organization Chart ............................................................................................................. 11 Roles and Responsibility ......................................................................................

Words: 8273 - Pages: 34

Premium Essay

Crashing

...responsible for the project. Indirect costs are $10,000 per week, and a penalty cost of $10,000 per week will be incurred for every week the projects is delayed beyond week 9. 1. What is the shortest time duration for the project regardless of cost? 2. What is the minimum total cost associated with completing the project in 12 weeks? 3. What is total time of the minimum-cost schedule? TABLE 2.8 DATA FOR THE EQUIPMENT INSTALLATION PROJECT Activity Normal Time (days) Normal Cost ($) Crash Time (days) Crash Cost ($) Immediate Predecessor($) A - 3 2 7,000 10,000 B - 1 1 3,000 3,000 C A 4 2 12,000 40,000 D B 2 1 12,000 28,000 E C 1 1 8,000 8,000 F D,E 4 2 5,000 15,000 G E 2 1 9,000 18,000 Based on the data in the Table, we can make the following network diagram: We see from the diagram that there are three paths for completion: Path 1: A – C – E – G Path 2: A – C – E – F Path 3: B – D – F We now calculate the time taken to complete each path to determine the critical path. Time taken for completion of Path 1 (A – C – E – G): 3 + 4 + 1 + 2 = 10 days Time taken for completion of Path 2 (A – C – E – F): 3 + 4 + 1 + 4 = 12 days Time taken for completion of Path 3 (B – D – F): 1 + 2 + 4 = 7 days From this we can see that Path 2 takes the longest time and hence is the Critical Path. We will start crashing the process on the critical path. To decide which activity to crash first, we look at the crashing cost per day and the activity with the least crashing......

Words: 954 - Pages: 4

Premium Essay

Crashing

...Crashing under test conditions R.Sivakumar P. R.Vittal R. Sivakumar and P. R.Vittal discuss a tabular approach to project crashing THE critical path method (CPM) was originally developed to solve scheduling problems in an industrial setting and, hence, more concerned with costs of project scheduling and how to minimise them. Therefore, an important aspect of network analysis is the cost of project. The cost of a project is not due solely to the direct costs associated with individual activities or jobs in the project. Normally, there are indirect expenses as well — overhead items such as managerial services, indirect supplies, equipment rentals, allocation of fixed expenses, and so forth. Many of these are directly affected by the length of the project: The longer the time required for its completion, the higher will be the expenses. In addition, if the project management is under contract to a government agency or some other customer to complete the programme by a given due date, often the contract will specify penalties for delay beyond this date. The normal duration of a project is the specified completion time of the project, wherein the duration of the activities, manpower, machine power, and so on, are all fixed already under normal conditions and, therefore, the project will also incur a given cost. However, to reduce the duration one may require, among other things, more manpower and machine power and this will increase the cost of the project.......

Words: 1124 - Pages: 5

Premium Essay

Projects

... ftoc.indd 16 10/10/08 5:17:22 PM SEVENTH EDITION PROJECT MANAGEMENT A Managerial Approach ffirs.indd 1 10/10/08 5:16:30 PM SEVENTH EDITION PROJECT MANAGEMENT A Managerial Approach Jack R. Meredith Broyhill Distinguished Scholar and Chair in Operations Wake Forest University Samuel J. Mantel, Jr. Joseph S. Stern Professor Emeritus of Operations Management University of Cincinnati John Wiley & Sons, Inc. ffirs.indd 3 10/10/08 5:16:35 PM ftoc.indd 16 10/10/08 5:17:22 PM Dedication To Avery and Mitchell, from “papajack.” J. R. M. To Maggie and Patty for their help, support, and affection. S. J. M. VICE PRESIDENT & EXECUTIVE PUBLISHER  Don Fowley EXECUTIVE EDITOR  Beth Golub ASSOCIATE EDITOR  Jen Devine MARKETING MANAGER  Carly DeCandia Design Director  Harry Nolan SENIOR DESIGNER  Kevin Murphy SENIOR PRODUCTION EDITOR  Patricia McFadden SENIOR Media editor  Lauren Sapira PRODUCTION MANAGEMENT SERVICES  Ingrao Associates This book was set in by GGS Book Services PMG and printed and bound by RRD/Willard. The cover was printed by RRD/Willard. This book is printed on acid free paper.  Copyright © 2009 John Wiley & Sons, Inc. All rights reserved. No part of this publication may be reproduced, stored in a retrieval system or transmitted in any form or by any means, electronic, mechanical, photocopying, recording, scanning or otherwise, except as permitted under Sections 107 or 108 of the...

Words: 181757 - Pages: 728

Free Essay

Project Management

...Week 4 homework: Part 1 A) The crash cost per day per activity 800-300=500 350-250=100 900-400=500 500-200=300 550-300=250 B) Which activities should be crashed to meet a project deadline of 10 days at minimum cost? What is the cost impact of crashing these activities? A; B; C $450 C) Find the new budget (or cost of the project) $1875 Part 2 A) The crash cost per day per activity 800-300=500 350-250=100 900-400=500 500-200=300 B)  Which activities should be crashed to meet a project deadline of 13 days at minimum cost? What is the cost impact of crashing these activities? [6 points] B $50 Part 3 A) Calculate the CV (Cost Variance). $535-$540=-5 B) Is the CV favorable or unfavorable? Yes C) Calculate the SV (Schedule Variance). $535-$523=$12 D) Is the SV favorable or unfavorable? No Part 4 A) Calculate the CV (Cost Variance). $34-$39=-5 B) Calculate the CPI (Cost Performance Index). $39/$34=1.15 C) Is the Cost favorable or unfavorable? Yes D) Calculate the SV (Schedule Variance $39-$42=7 E) Calculate the SPI (Schedule Performance Index) $39/$42=.93 F) Is the schedule favorable or unfavorable? No Part 5 A) Calculate the CV (Cost Variance). $678-$550=128 B) Calculate the CPI (Cost Performance Index). $678/$550=1.23 C) Is the Cost favorable or unfavorable? Yes D) Calculate the SV (Schedule Variance). $678-$735=-57 E)......

Words: 325 - Pages: 2