Premium Essay

Cost Analysis Project

In: Other Topics

Submitted By clintruss74
Words 281
Pages 2
David Jones, the new administrator for a surgical clinic, was trying to determine how to allocate his indirect expenses. His staff was complaining that the current method of taking a percentage of revenues was unfair. He decided to try to allocate utilities based on square footage of each department, administration based on direct costs, and laboratory based on tests. Use the information in the chart below to answer problems 1–3.

Square Footage Direct Expenses Lab Tests
Utilities $ 200,000
Administration 2,000 500,000
Laboratory 2,000 625,000
Day-op Suite 3,000 1,400,000 4,000
Cystoscopy 1,500 300,000 500
Endoscopy 1,500 600,000 500
Total 10,000 $ 3,375,000 5,000

1. What are the Day Op Suite’s total expenses?

2. What are the Cystoscopy Department’s total expenses?

3. What are the Endoscopy Department’s total expenses?

The information below applies to problems 4 and 5. Your nursing home defines output as a patient day. Its present volume is 26,000 patient days. The average cost per day is $90.00. Present revenues and costs are presented below:

Revenues: Charge Patients (6,000 Patient Days) $ 750,000 Fixed-Price Patients (20,000 Patient Days) 1,800,000 Total Net Revenues $2,550,000
Costs:
Fixed Costs $1,170,000 Variable Costs ($45/PD) 1,170,000 Total ($90/PD) 2,340,000 Net Income $ 210,000

Using this information, answer the following two questions:

4. What is the breakeven in patient days for this nursing home, assuming no profit is required?

5. If volume goes up 10% to 28,600 patient days and payer mix is unchanged, what will net income…...

Similar Documents

Premium Essay

Cost Analysis

...the cost of Job No. 101 and calculate the price to be charged so as to give a profit of 20% on selling price. Batch costing A customer has been ordering 90000 special design metal columns at the rate of 18000 per order during the past years. The production cost comprises of Rs. 120 for material, Rs. 60 for labour and Rs. 20 for fived overheads. It cost Rs. 1500 to setup for one run of 18000 column and inventory carrying cost is 15%. Since the customer may buy atleast 5000 columns this year, the company would like to avoid making five different production runs. Find the mo0st economic production run. X is committed to supply 24000 bearings per annum to Y ltd. On a steady basis. It is estimated that it will cost .10 as inventory holding cost per bearing per month and that the set up cost per run of bearing manufacture is Rs. 324. a) What would be the optimum run size for the bearing manufacture? b) What is the minimum inventory holding cost at optimum run size? c) Assuming the the company has a policy of manufacturing 6000 bearing per run, how much extra cost would the company be incurring as compared to the optimum run suggested in (a)? Contract costing Mr. Bharat undertook a contract no. 501 for Rs. 500000 on 1st july 2005. On 31st march 2006 when the accounts were closed the follo0wing information was available. Materials used to site | 55000 | Wages paid | 18000 | Site office costs | 6000 | General overheads | 25% of wages | Site office costs......

Words: 658 - Pages: 3

Premium Essay

Cost Analysis

...The allocation of the current method of allocating of warehousing and shipping cost is not really correct. The current method is direct method which ignores In term of Shipping and Warehousing cost, low volume products should incur this cost instead of both high volume and low volume products. Because, high volume products are deliveried directly to customer so it does not incur the cost of shipping. The low volume products which are sent to distribution center incurred the cost of shipping and warehousing. However, the cost of shipping and warehousing are allocated to both high volume and low volume products. Therefore, this allocation method is incorrect. ii. ABC systems uses different cost drivers for different activities so that they are more accurate cause of cost because they indicate the cause and effect relationship between the cost drivers and cost objectives. Therefore, the final product will show the correct resource usage per product. We assumed that ABC systems is more appropriate for costing high volume, low volume because firstly, the activity cost pool do not have the same cost driver and secondly, two products use the activities different per unit oof products. Activity | Cost | Activity cost driver | Paper machine OPeration | | Machine Hours | Finishing machine operation | | Machine Hours | Design | | Design Hours | | | | iii. Total cost of Sand W: $1,160,000 ( $500,000+$600,000) Total quantity of LVP:......

Words: 547 - Pages: 3

Premium Essay

Course Project: Cost Analysis for Decision Making

...The Cost Analysis for Decision Making project is intended to be a comprehensive evaluation of the key objectives covered throughout this course. It will challenge you to apply your knowledge of cost information when evaluating the decision to make or buy a product. Please use this outline and grading rubric as a guide to completing your course project. It provides specific details of the required elements of the project, and it will be used by your instructor as a grading guide. Read Integrative Case 4-61, "Make versus Buy," on pages 157 and 158 of the course text. Assume that you are the general manager (Mr. Walsh) faced with this decision. You have identified the following four alternatives available to Liquid Chemical Co. Alternative A: It is the status quo. (i.e., Liquid Chemical Co. will continue making the containers and performing maintenance.) Alternative B: Liquid Chemical Co. will continue making the containers, but it will outsource the maintenance to Packages, Inc. Alternative C: Liquid Chemical Co. will buy containers from Packages, Inc., but it will perform the maintenance. Alternative D: It is completely outsourced. Packages, Inc. will make the containers and provide the necessary maintenance. Your project should include the following items: Part (a): Discuss each of the four alternatives outlined above. Identify the relevant costs (including amounts) for each of the four alternatives, and explain why these costs are relevant to the decision.......

Words: 333 - Pages: 2

Premium Essay

Project Cost and Scheduling

...1! Project Scope Definition and WBS In this course, we will explore project cost and schedule control! The focus of this week is developing the scope and the work breakdown structure (WBS). We will use the WBS to specifically detail the tasks required to complete any project. The scope is the starting document of a project. It defines the project. The WBS is created from the scope and is the basis on which several other project documents, such as the budget and schedule, will be derived from. Because the WBS is one of the foundations to our planning effort, it is critical to know and understand this tool. Shortcomings in the scope or WBS will translate to the rest of our planning documents resulting in real failures during project execution to attain goals in scope, cost, and schedule. It is, therefore, of primary importance that the scope and WBS are inclusive and detailed. Just remember that as a project manager, your family comes first but the project scope and WBS are not far behind. Introduction Cost and schedule form two sides of the iron triangle of project management with the third side being the collection of scope, quality, and performance. This makes cost and schedule paramount concerns to a project manager. Cost and schedule control on a project are vital to a successful project. As you know, this course is named Project Schedule and Cost Control, which may imply that the project is underway and it's time to go to work. However, the process for project......

Words: 14442 - Pages: 58

Premium Essay

Project Cost Management

...Overview of Project Cost Management According to an accounting textbook, cost is defined as a resource sacrificed or foregone to achieve a specific objective. It is something given up in exchange. It is necessary for project managers to understand project cost management since project costs money and consumes resources. There are reasons for project cost overrun and these are as follows: * Not emphasizing the importance of realistic project cost estimates from the outset. IT project cost estimates are low to start with or based on unclear project requirements. * Many IT professionals think that preparing cost estimates is a job for accountants when in fact, it is a very demanding and important skill that project managers need to acquire. * Many IT projects involve new technology or business processes that involve untested products and inherent risks. Project cost management involves the processes required to ensure that the project is completed within an approved budget. These processes are as follows: * Estimate costs * Determine budget * Control costs As project managers, understanding the basic principles of cost management is a must in order for them to be effective in managing project costs. Important concepts include profits and profit margins, life cycle costing, cash flow analysis, internal rate of return, tangible and intangible costs and benefits, direct costs, sunk costs and learning curve theory. Profits are revenues minus......

Words: 2211 - Pages: 9

Premium Essay

Cost Analysis

...Cost-Volume-Profit Review Problems (For Exam 1) QUESTION 1 Bridal Shoppe sells wedding dresses. The cost of each dress is comprised of the following: Selling price of $1,000 and variable (flexible) costs of $400. Total fixed (capacity-related) costs for Bridal Shoppe are $90,000. A. What is the contribution margin per dress? Revenues – Flexible Costs = CM $1,000 - $400 = $600 B. What is the Bridal Shoppe’s total profit when 200 dresses are sold? Revenues – Flexible Costs – Capacity-Related Costs = Total Profit 200 ($1,000) – 200($400) - $90,000 = $30,000 C. How many dresses must Bridal Shoppe sell to reach the breakeven point? X = Capacity-Related Costs/Contribution Margin X = $90,000/$600 X = 150 dresses D. How many dresses must Bridal Shoppe sell to yield a profit of $60,000? Total Revenues – Total Costs = Total Profit $1,000X - $400X - $90,000 = $60,000 $600X = $150,000 X = $150,000/$600 X = 250 dresses QUESTION 2 Northenscold Company sells several products. Information of average revenue and costs are as follows: Selling price per unit $20.00 Variable costs per unit: Direct materials $4.00 Direct manufacturing labor $1.60 Manufacturing overhead $0.40 Selling......

Words: 407 - Pages: 2

Premium Essay

Cost Analysis

...Cost Analysis 1st August – 12th August 2011 Syllabus FINC 327 - Cost Analysis 2011 Assessment: An unseen, two hour closed book examination: Part A Compulsory, Part B & C, A choice of ONE of TWO questions THREE questions in total Recommended Textbook Colin Drury, Cost and Management Accounting, an introduction, Pub. Thomson, 7th Edition WWW.thomsonlearning.co.uk ISBN 0-412-58780-7 Lecturer: Prof. Melvin Ch. Williams E-mail: mcwilliams23942@btinternet.com Prof. M C Williams, Cardiff University 1 Cost Analysis 1st August – 12th August 2011 Programme Day 01.08.2011 • • • • • • • • • • • • • • • • • • A.M. Introduction Costing Definitions Cost Behaviour Job Costing Material Costing Labour Costing Overhead Analysis Total Absorption Costing Total Absorption Costing Activity Based Costing Variable (Marginal) Costing CVP Analysis CVP Analysis Relevant Costing for decision-making Budgeting Budgetary Control Budgetary Control Exam • P.M. Worked examples 02.08.2011 03.08.2011 04.08.2011 05.08.2011 08.08.2011 09.08.2011 10.08.2011 11.08.2011 12.08.2011 • • • • • • • Worked examples Worked examples Worked examples Worked examples Worked examples Worked examples Worked examples NOTES 1. A calculator is a must for this module – a mobile phone is insufficient. 2. Also, a ruler, pencil and eraser should be brought each day. 3. You MUST print out the hand-outs and tutorial questions for yourselves and bring them with you each day. They are needed, so......

Words: 10950 - Pages: 44

Premium Essay

Cost Analysis

...CHAPTER 3: COST ANALYSIS Multiple Choice b 1. The principal advantage of the scatter-diagram method over the high-low method of cost estimation is that the scatter-diagram method a. includes costs outside the relevant range. b. considers more than two points. c. can be used with more types of costs than the high-low method. d. gives a precise mathematical fit of the points to the line. a 2. The major objective of preparing a scatter-diagram is to a. derive an equation to predict future costs. b. perform regression analysis on the results. c. determine the relevant range. d. find the high and low points to use for the high-low method of estimating costs. d 3. The cost estimation method that gives the most mathematically precise cost prediction equation is a. the high-low method. b. the scatter-diagram method. c. the contribution margin method. d. regression analysis. c 4. Which cost is most likely to be mixed for a manufacturer? a. Raw materials. b. Direct labor. c. Manufacturing overhead. d. Insurance. b 5. Which combinations of object of cost and classification of cost is most reasonable? Object of Cost Classification of Cost --------------- ---------------------- a. Materials used to make products Discretionary fixed cost b. Advertising cost Discretionary......

Words: 2956 - Pages: 12

Free Essay

Cost Analysis

...and where the employee’s duties are preferred. On the other hand, an independent contractor is hired for a service and the client has no control or authority over how the contractor works but has a decision on whether to accept or decline the final product. As a business owner there are several considerations before making a decision with as much of a risk as the potential profit. Depending on the situation, meaning the number of hours predicted to work and the scheduling, it may be more beneficial for the company to hire an independent contractor for tax and payroll incentives. This creates a profit for the client because it does not have to be liable for FICA if the person is self-employed and does not have to pay payroll administrative costs to compensate the contractor. Keep in mind however that the IRS does have an aggressive Revenue team that may challenge the fact that the person is an independent contractor and the client might be liable for the taxes unpaid plus penalties. As a worker, I see it best to be an employee because of the benefits provided along with the help the company pays on your taxes. These are all incentives not offered to independent contractors and should be recognized because when you file taxes as an employee, you would not have to worry as if you were self-employed. 2. What is the passive activity loss limitation? Are rental activities passive activities? Why or why not? Passive activity loss is a business interest classification that has an......

Words: 593 - Pages: 3

Free Essay

Acc 227 Week 9 Final Project Cost Accounting Analysis

...ACC 227 WEEK 9 FINAL PROJECT COST ACCOUNTING ANALYSIS To purchase this visit here: http://www.nerdypupil.com/product/acc-227-week-9-final-project-cost-accounting-analysis/ Contact us at: nerdypupil@gmail.com ACC 227 WEEK 9 FINAL PROJECT COST ACCOUNTING ANALYSIS ACC 227 Week 9 Final Project Cost Accounting Analysis Home Work Hour aims to provide quality study notes and tutorials to the students of ACC 227 Week 9 Final Project Cost Accounting Analysis in order to ace their studies. ACC 227 WEEK 9 FINAL PROJECT COST ACCOUNTING ANALYSIS To purchase this visit here: http://www.nerdypupil.com/product/acc-227-week-9-final-project-cost-accounting-analysis/ Contact us at: nerdypupil@gmail.com ACC 227 WEEK 9 FINAL PROJECT COST ACCOUNTING ANALYSIS ACC 227 Week 9 Final Project Cost Accounting Analysis Home Work Hour aims to provide quality study notes and tutorials to the students of ACC 227 Week 9 Final Project Cost Accounting Analysis in order to ace their studies. ACC 227 WEEK 9 FINAL PROJECT COST ACCOUNTING ANALYSIS To purchase this visit here: http://www.nerdypupil.com/product/acc-227-week-9-final-project-cost-accounting-analysis/ Contact us at: nerdypupil@gmail.com ACC 227 WEEK 9 FINAL PROJECT COST ACCOUNTING ANALYSIS ACC 227 Week 9 Final Project Cost Accounting Analysis Home Work Hour aims to provide quality study notes and tutorials to the students of ACC 227 Week 9 Final Project Cost Accounting Analysis in order to ace their......

Words: 493 - Pages: 2

Premium Essay

Cost and Analysis

...American Requirements David Moore Strayer University Cost and Analysis BUS 315 Michael Raponi February 17, 2016 Buy American Requirements Buy American is a section of the American Recovery and Reinvestment Act (ARRA) that substantially increases funds distributed by the federal government to the local, and state governments over a period of years illustrates that the increased funding of the federal, state and local projects imposes additional requirements on the contractors and their suppliers to ensure that the products or material composition that they utilize during the construction and completion of those projects must contain a certain percentage of USA made goods and components. Under the Buy American Act and the Buy America, products that do not meet the domestic requirements are permitted to include a ‘cost premium’ to the price that is offered to the purchaser or contractor of an item used in completing a project. Johnson suggests that the Buy American Act applies in cases where the federal government directly purchases materials or products or a federal facility or building. It requires that the final product must contain 51 percent of components made in the US. A cost waiver happens when the domestic materials are 6 percent higher than the foreign materials. The act also allows a price premium of 6 percent to be charged if the local requirements are not met. The Buy America applies to the projects undertaken by the state and local governments and......

Words: 2064 - Pages: 9

Premium Essay

Project Risk Cost

...Preparing Project Budgets for Business Cases Technical guide The Secretary Department of Treasury and Finance 1 Treasury Place Melbourne Victoria 3002 Australia Telephone: +61 3 9651 5111 Facsimile: +61 3 9651 5298 www.dtf.vic.gov.au Authorised by the Victorian Government 1 Treasury Place, Melbourne, 3002 © Copyright State of Victoria 2012 This book is copyright. No part may be reproduced by any process except in accordance with the provisions of the Copyright Act 1968. ISBN 978-1-922045-92-8 Published August 2012. If you would like to receive this publication in an accessible format please telephone 9651 0909 or email mailto:information@dtf.vic.gov.au Contents 1. Background 1 1.1 Context 1 1.2 Purpose – developing and managing project budgets 2 1.3 Scope of application 2 1.4 Structure of this guide 3 1.5 Related guides and frameworks 3 1.6 The need for an accurate project budget 4 2. Elements of a project budget 5 2.1 The headline elements of a project budget 5 2.2 Successful financial planning 9 2.3 The need for a whole-of-life approach 10 2.4 ‘Poor project planning’ risks are not project risks! 10 2.5 Delivering to budget 11 3. Foundations for good project budgets 12 3.1 Better business cases and better project budgets 12 ...

Words: 21569 - Pages: 87

Premium Essay

Analysis of Costs

...Analysis of cost The role of costs goes far beyond influencing production and profits. Costs affect input choices, investment decisions, and even the decision of whether to stay in business. Is it to hire a new worker or to pay overtime? To open a new factory of expand and old one? To invest in new machinery domestically or relocate production abroad? Bangladesh want to choose those methods of production that are most efficient and produce output at the lowest cost. Analysis of cost is devoted to a thorough. First we consider the full array of economic cost, including the central notion of marginal costs. Then we examine how business accountants measure cost in practice. Short – Run Cost: ← Total cost ← Marginal cost ← Average cost Total Cost Total cost means that represents the lowest total dollar expense needed to produce each level of output q. TC rises as q rises. So that a firm’s total cost (TC) is the cost of all the factors of production it uses. We divide total cost into total fixed cost and total variable cost. Total cost is the sum of total fixed cost and variable cost. That is, TC = FC + VC Fixed Cost Sometimes we can be called “overhead” or “sunk costs”, they consist of items such as rent for factory or office space, contractual payment for equipment, interest payments on debts, salaries of tenured faculty, and so forth. These must be paid even if the firm produces no output, and they don’t change if output changes. For...

Words: 1683 - Pages: 7

Premium Essay

Cost Analysis

...Project Proposal: Local Grind To Hootman Investing PM592 – Summer 2011 Executive Summary When you think of coffee in the Northwest, most people know there is Starbucks and small coffee shops. Coffee shops have become a familiar feature of American communities, not only for the purchase of a morning cup of coffee and snacks, but for mid-day and evening as well. With the introduction of fancy espresso-based coffee and drinks, people are spending between $3 and $6 for their cappuccino, mocha latte, vanilla ice blended drink, or other flavored drink that may be coffee based. Privately owned coffee houses have been on the increase for over 20 years because they are relatively recession proof. Leading companies, such as Starbucks and Peet’s, are located in almost every major city in the US. Small unique coffee shops like the Local Grind are able to compete with these larger chains; they are able to develop competitive advantages by catering to the specific demographics of their location and by personalizing their services to cater local needs. Our goal is to provide quality coffee related services and products by capitalizing on an untapped demographic that has many potential un-serviced customer. To accomplish our goals, we are requesting $100,000 from your company, as an initial investment to set up operations. We plan to invest an additional 20% from our own resources, up front, for the start up operational costs. Local Grind is scheduled to open for......

Words: 2572 - Pages: 11

Premium Essay

Costs of Project

...Iinputting the variable cost information for the resources (manpower) used such as; the project manager, general contractor and the manufacturing engineer and the fixed costs assigned to project deliveries such as; $32,000 for building design, a construction of $2,100,000 and $780,000 for plant equipment.   At this point it would appear that with a proposed budget limit of $2,750,000 set by the company’s Board of Directors that we are on target with an estimated total budget of $2,633,532 for the Huntsville Plant Project. As you can see we don’t have very much room (budgetary) for any missteps therefore, it will be necessary for very member of the team monitor and control individual budgets and areas of responsibility. Within the Huntsville project is divided into key project phases and probably the most important phase to ensure the success of the entire project is the planning phase. There a few critical deliverables that must be completed within the ten weeks set aside for planning.   Just to point out a few key “must happens” such as; procure the plant’s worksite, obtain all needed permits and approvals and the selection of an general contractor not to say we can relax or slack on any part of the project’s tight budget and schedules, again the planning phase is only ten weeks with a budget of only $285,754 the project’s first test. After the planning phase is the preparation phase were the project is really defined and it is critical to the success of the project that......

Words: 339 - Pages: 2